Multi-module CFBT Training Structure

Container-Based Training System Solution

Struttura di training CFBT a moduli multipli
Soluzione di sistema di addestramento basata su container


Overview of the Facility


  • This facility has been designed and designated as a training center by the IFIW (International Fire Instructors Organization). The overall design is aligned with European standards. The structure consists of five levels and includes 21 containers of various sizes.

  • CFBT (Compartment Fire Behavior Training) refers to training on fire and smoke behavior in indoor environments, firefighter hose stream application, ventilation and smoke extraction, and other fundamental aspects of firefighting operations.

  • Unlike traditional gas-fired training props, this container-based training structure uses wood as fuel, i.e., a dual Class A fire system. This allows the simulation of realistic Class A fire scenarios characterized by chaos, dense smoke, and complex environmental conditions, thereby increasing realism and enabling advanced training on real fire behavior.

​Panoramica della struttura

  • Questa struttura è stata progettata e designata come centro di addestramento dall’IFIW (International Fire Instructors Organization). Il progetto complessivo è conforme agli standard europei. La struttura è composta da cinque livelli e comprende 21 container di diverse dimensioni.

  • Il CFBT (Compartment Fire Behavior Training) si riferisce alla formazione sul comportamento del fuoco e dei fumi in ambienti chiusi, sull’applicazione del getto d’acqua da parte dei vigili del fuoco, sulla ventilazione e sull’estrazione dei fumi, nonché su altri aspetti fondamentali delle operazioni antincendio.
  • A differenza dei tradizionali simulatori di addestramento alimentati a gas, questa struttura di formazione basata su container utilizza legna come combustibile, ovvero un sistema di incendio di Classe A a doppia configurazione. Ciò consente la simulazione di scenari di incendio di Classe A realistici, caratterizzati da caos, fumo denso e condizioni ambientali complesse, aumentando così il livello di realismo e permettendo un addestramento avanzato sul comportamento reale del fuoco.

Visione panoramica dall'alto

(Visual overview of the container structure from above)

Visione panoramica dall'alto

(panoramica dall'alto della struttura del container)


Ground Floor Plan

Based on the international standard layout of CFBT training facilities.


By using Class A fire combustion chambers on both sides, the structure is divided into two training areas connected through typical building structures.

Key Areas:

  1. Class A fire containers 1, 2, and 3
  2. T-shaped attack corridor
  3. Backdraft / Flashover training room
  4. Staircases, elevator shaft, elevator anteroom, smoke-protected stair anteroom

The three training areas are interconnected by doors along the corridors, allowing combined training exercises or the creation of separate training courses.

Mappa del piano terra

Basato sul layout standard internazionale delle strutture di addestramento CFBT

Tramite l'utilizzo di camere di combustione di classe A su entrambi i lati, la struttura viene divisa in due aree di addestramento collegate da strutture edilizie specifiche.

Zone chiave

  1. Contenitore per il fuoco classe A 1,2 e 3
  2. Corridoio di attacco a forma di T
  3. Stanza di addestramento per backdraft/flashover
  4. Scale, vano ascensore, filtro ascensore, filtro a prova di fumo delle scale.

Le tre aree di addestramento sono interconnesse tramite porte lungo i corridoi, consentendo esercitazioni combinate oppure la creazione di percorsi formativi separati.


Mappa del primo piano

The roof of the first level allows for top-down fire attack, simulating underground fire scenarios.

The second-level layout is dedicated to search and rescue training in a maze-like environment. Main training activities include:

  1. Rescue operations in smoke-filled environments
  2. Ventilation and smoke extraction training
  3. Underground fire scenarios
  4. Use of the fire service elevator

Smoke generated by the first-level combustion chambers is directed into the second-level training rooms through natural smoke movement or via the smoke evacuation system.

Inside the compartments, movable grid floor structures are installed. These can be flexibly combined to adjust the difficulty level of rescue operations and adapt training to firefighters with different experience levels.

Mappa del primo piano

The roof of the first level allows for top-down fire attack, simulating underground fire scenarios.

The second-level layout is dedicated to search and rescue training in a maze-like environment. Main training activities include:

  1. Operazioni di salvataggio in ambienti pieni di fumo
  2. Formazione alla ventilazione e all'estrazione di fumi
  3. Scenari di incendi sotto terra
  4. Utilizzo dell'ascensore antincendio

Il fumo generato dalle camere di combustione del primo livello viene convogliato nelle sale di addestramento del secondo livello tramite il movimento naturale dei fumi oppure attraverso il sistema di evacuazione dei fumi.

All’interno dei compartimenti sono installate strutture di pavimentazione a griglia mobili. Queste possono essere combinate in modo flessibile per regolare il livello di difficoltà delle operazioni di soccorso e adattare l’addestramento ai vigili del fuoco con diversi livelli di esperienza.



Second Floor Plan ​

Mappa del secondo piano




Third Floor Plan ​

Mappa del terzo piano




Fourth Floor Plan ​

Mappa del quarto piano